Warwick Highway Weekly Log Oct. 19 - 25, 2009 Mon. Oct. 19 Cleaned up beaver debris in various locations Continued cleaning out ditch line on W. Rum Brook Rd. Hired contractor continued cutting brush on various roads in town Cleaned leaves out of roadways to prepare for grading Met with Verizon representative to go over pole placements on Richmond Rd. Repaired stop sign on Hastings Heights Rd. Tues. Oct. 20 Continued cleaning out ditch lines on West Rum Brook Rd. Graded and rock raked Old Winchester Rd. and Robbins Rd. Brian Peters Electric hooked up new service for pressure washer Wed. Oct. 21 Continued cleaning out ditch lines on West Rum Brook Rd. Finished grading and rock raking Old Winchester Rd. and Gale Rd. Hired contractor continued cutting brush on various roads in town Thurs. Oct. 22 Graded and rock raked Chestnut Hill Rd. and Shepardson Pl. Continued cleaning out ditch lines on West Rum Brook Rd. Hired contractor continued cutting brush on various roads in town Tim went on fire call Fri. Oct. 23 Continued cleaning out ditch lines on West Rum Brook Rd. Repaired broken hydraulic line on Backhoe Did driveway inspection at Copper Angel Rest. Hired contractor continued cutting brush on various roads in town Cleaned out bleeders on Robbins Rd. Installed new street signs around town Cut down tree on Athol Rd. for tree warden so Verizon could install new pole