Warwick Highway Weekly Log Jan. 4 - 10, 2010 Mon. Jan. 4 All personnel came in at 2 A.M. to plow and sand all roads - private contractors came in at 8 A.M. to plow their routes then have them sanded - 1" of snow Crushed dumpsters at transfer station Changed cutting edges on plow # 3 and plow # 4 Re-scraped all main roads of slushy snow Tues. Jan 5 Did complete services on Loader, Truck # 2 and Truck # 3 Re-scraped all paved roads of slushy snow as necessary Pushed back snow bankings around town Wed. Jan 6 Plowed and sanded lower W. Rum Brook Rd. for seasonal resident Washed trucks and Loader Checked all roads in town for road conditions Made repairs to truck # 3 sander Met with David Young to go over highway issues Thurs. Jan 7 Cut brush on Bass Rd. Went to Porter's for supplies Brush chipper quit running while on Bass Rd. - unable to fix or diagnose problem - brought to Porter's for repair Fri. Jan. 8 Sanded all roads due to 1" of snow Washed out sand trucks Dropped Loader tire off at Pete's Tire Barn for repair Picked up chipper from Porter's and dropped off truck # 4 for repair Replaced filter on diesel fuel pump