Warwick Highway Weekly Log Jan. 5 - 11, 2009 Mon. Jan. 5 * Called in personnel at 3 A.M. to sand all roads twice due to freezing rain * Checked hazardous waste area for leaks finding none * Crushed dumpsters at transfer station * Washed sand trucks and greased * Had repairman work on hydraulic leak in backhoe * Met with Chief Peters, David Young and Keith Wilson from FRCOG to go over speed study results Tues. Jan. 6 * Jim on day off * Brought truck # 2 down to Lyman signs to be lettered * Tim went on fire call * Tim brought extinguisher company around town to inspect all fire extinguishers in town buildings * Worked on some icing problems on town roads * Readied equipment for storm Wed. Jan. 7 * All personnel came in at midnight to begin sanding all roads - switched to sleet at 3:30 A.M. and began mixing with freezing rain at 5 A.M. - sanded dirt roads at 5 A.M. - became all freezing rain at 7 A.M. going back to sleet at 9 A.M. then mixing with freezing rain at 11:30 A.M. - began plowing and sanding combination at 1 P.M. - called in private contractors at 3:15 P.M. - went home at 8 P.M. - 2" of snow, sleet and freezing rain Thurs. Jan. 8 * Sanded all roads due to light snow and icy conditions - 1" of snow * Plowed off slush on various roads * Cleaned out sand trucks and 1-Ton truck * Met with Keith Wilson to go over speed study final results * Re-plowed all main roads in the afternoon to clean off slush with warmer temperatures - went home at 6:30 P.M. Fri. Jan. 9 * Met with MHQ salesman to go over body on new truck * Cut up trees damaged by recent ice storm * Radio repair in to fix truck # 3 radio * Met with David to go over speed study final results * Made adjustments to truck # 2 spinner disk * Cut down tree in Transfer Station for BOH Sat. Jan. 10 * Called in all personnel at 10 P.M. for snow storm - began plowing and called in private contractors at 11:45 P.M. - began sanding at 12:15 P.M. - went home at 4:00 P.M. on Sun. - 8" of snow