Warwick Highway Weekly Log Nov. 2 - 8, 2009 Mon. Nov. 2 Bill on vacation day Put bank run and crushed gravel on lower portion of West Rum Brook Rd. Tues. Nov. 3 Bill on vacation day Finished putting crushed gravel on West Rum Brook Rd. Replaced tire on truck # 4 that received a non-repairable flat at Pete's Tire Did fall drive around checking all roads for problems to correct before winter Crushed dumpsters at transfer station and smoothed out parking area Wed. Nov. 4 Switched over truck # 3 to sander body Cut down several dangerous trees for tree warden around town Rip rapped washout on Athol Rd. Did finish work on West Rum Brook Rd. Thurs. Nov. 5 Switched over truck # 2 to sander set-up Smoothed out potholes on Richmond Rd. Worked on speed study changes received from Boston Fri. Nov. 6 Cut brush on Chase Hill Rd. Continued working on speed study changes Met with salesman on getting needed signs for speed study Prepared FY 2011 Budget for David Young