Warwick Highway Weekly Log Dec. 7 - 13, 2009 Mon. Dec. 7 Received report of icy conditions on Northfield Rd. - spot sanded roads as necessary Checked out truck # 3 for problem that occurred Sat. night while plowing - unable to locate problem Changed cutting edges on plows 2 and 4 Met with David Young on highway issues Tues. Dec. 8 Cut brush on Athol Rd. and Winchester Rd. that hired brush mower could not reach Brought truck # 3 to Porter's to get electrical problem repaired - truck was repaired and picked up Wed. Dec. 9 Two personnel came in at 3 A.M. to begin sanding paved roads when snow started - snow began at 4 A.M. - began plowing main roads at 6:45 A.M. - called in private contractors at 8 A.M. - plowed all roads then sanded all roads - went home at 6:30 P.M. - 10" of snow and sleet Thurs. Dec. 10 Scraped a couple of roads with plow and sanded all roads due to icy conditions Brought truck # 4 to T&R Custom to have repaired Washed out sand trucks Fri. Dec. 11 Tim and Vin out sick Washed Loader and cleaned equipment Greased trucks and Loader Serviced chainsaws Sun. Dec. 13 Called in two personnel at 2:30 P.M. to sand all paved roads due to snow changing to rain - went home at 6 P.M.