Warwick Highway Weekly Log Jan. 26 - Feb. 1, 2009 Mon. Jan. 26 * Bill on day off * Checked hazardous waste area for leaks finding none * Did a service on truck # 4 * Did a service on Loader * Brought truck # 4 to Pete's Tire for repairs * Sprayed Lubrikoat sealant on air components on new truck to protect them from corrosion * Met with David to go over highway issues * Changed cutting knives on Chipper Tues. Jan. 27 * Continued cutting brush on Flower Hill Rd. * Prepped trucks for winter storm Wed. Jan. 28 * Began plowing and called in private contractors at 9:15 A.M. - continued plowing with switch to sleet and freezing rain into the afternoon - began sanding all roads at 5:30 P.M. - went home at 9:30 P.M. Thurs. Jan. 29 * Re-scraped all main roads and sanded as necessary to get slush off the roads * Checked road conditions and cut down trees damaged by freezing rain * Met with David on highway issues Fri. Jan. 30 * Jim on day off * Brought truck # 2 down to Nutmeg Truck for warranty repairs * Delivered speed study materials to Mass Highway for their review * Widened Gale and Beech Hill roads