Warwick Highway Weekly Log May 4 - 10, 2009 Mon. May 4 * Bill out sick * Checked hazardous waste area for leaks finding none * Hired sweeper in town to clean up center * Cleaned up ice storm debris damage on White Rd. and began Shepardson Rd. Tues. May 5 * Cleaned out culverts on Shepardson Rd. and Shepardson Pl. * Crushed dumpsters at transfer station * Built side boards for truck # 2 * Changed all air filters in truck # 4 * Went to Orange for supplies Wed. May 6 * Continued cleaning up ice storm debris damage on Shepardson Rd. and Chestnut Hill Rd. * Finished sweeping roads with hired sweeper around Moore's Pond * Marked roads for asphalt patching * Called National Grid on dangerous tree on Shepardson Rd. near wires * Checked out culverts that were cleaned yesterday for condition * Met with David to go over FEMA contract issues Thurs. May 7 * Tim went to seminar on asphalt in Chicopee * Cleaned up equipment and trucks * Installed various street signs in town * Repaired some minor washouts in town * Checked roads for rain storm damage * Worked on clearing culvert on Hastings Pond Rd. * Dropped off tires at Pete's for repairs Fri. May 8 * Vin out sick * Picked up tires at Pete's * Continued cleaning up ice storm debris on Chestnut Hill Rd., Quarry Rd. and began Bass Rd. * Tested some new type of cold patch in pot holes from yesterday seminar on our roadway * Met with Lane Construction on Orange Rd. paving job * Ran portable generator for monthly test