Warwick Highway Weekly Log May 5 - 11, 2008 Mon. May 5 * Tim and Bill out sick today * Put out 88 yds. of coarse gravel on lower Chestnut Hill Rd. and graded it Tues. May 6 * Did driveway permit inspection * Graded and rock raked remainder of Chestnut Hill Rd. and did Shepardson Pl. and White Rd. * Met with Gorman Bros. salesman on paving project Wed. May 7 * Graded and rock raked Bass Rd., Flower Hill Rd. and Buzzell Pl. * Finished cutting down stumps on Winchester Rd. * Spoke to Women's Guild Thurs. May 8 * Dug out ditch line in Gulf area * Met with people who want roadside fill * Met with contractor on trench permit on Wendell Rd. * Loamed and seeded damaged areas by town hall from winter snow removal Fri. May 9 * Cleaned up water fountain in center of town * Removed dead lower branches on fir tree in common that were affecting pedestrians in area of sidewalk * Cut leaning trees from winter storms on Winchester Rd. and Athol Rd. * Met with tire salesman * Met with resident on road issue on Old Winchester Rd. - cleaned out culvert and bleeder * Met with Town Accountant on budget figures * Met with David Young on highway issues