Warwick Highway Weekly Log June 8 - 14, 2009 Mon. June 8 * Checked hazardous waste area for leaks finding none * Crushed dumpsters at transfer station * Graded and rock raked rest of Gale Rd. and Beech Hill Rd. Tues. June 9 * Dug out stump on W. Rum Brook Rd. * Dug out rock on Gale Rd. * Moved pile of dirt debris by end of Garage Rd. * Hauled and put rip rap in ditch line on Gale Rd. near house # 316 * Met with David to go over highway issues Wed. June 10 * Graded and rock raked Hastings Pond Rd., North Holden Rd. Kirk Rd. and W. Rum Brook Rd. * Participated in Yankee Atomic plant drill at fire station all day Thurs. June 11 * Hauled and put rip rap in ditch line on Gale Rd. near house # 316 * Met with Lane Const. to go over repaving of Orange Rd. Fri. June 12 * Jim out sick today * Installed new batteries in truck # 3 * Met with salesman on street signs and tow behind sweepers * Hauled stone from Lane back to Hwy. Garage stock pile Sun. June 14 * Received call from Shelburne Control of tree across road on Rt. 78 by picnic area at 10 A.M. - called in personnel to remove