Warwick Highway Weekly Log Aug. 10 - 16, 2009 Mon. Aug. 10 * Crushed dumpsters at transfer station * Repaired sinkhole by basin on Flower Hill Rd. * Repaired washed out edge of road on Wendell Rd. * Continued cleaning out basins on Barber Hill area Tues. Aug. 11 * Continued cleaning out basins on Barber Hill area * Inspected Chestnut Hill Rd. bridge - closed bridge due to cracked timbers and notified Police and Fire Depts. of bridge closure * Rip rapped washouts by culverts on a couple of roads in town * Flipped chipper knives * Met David Young and Chief Peters to go over speed study recommendations from Mass Highway Wed. Aug. 12 * Worked on plugged culvert on Athol Rd. * Continued cleaning out basins on Barber Hill area * Dealt with private contractor putting water line across Wheeler Rd. Thurs. Aug. 13 * Hired Kerry Black to open up plugged culvert on Athol Rd. * Flushed various culverts in town with fire truck * Finished cleaning out culverts and bleeders on Chestnut Hill Rd. Fri. Aug. 14 * Jim on vacation day * Vin out sick * Patched various roads with hot mix asphalt