Warwick Highway Weekly Log Aug. 11 - 17, 2008 Mon. Aug. 11 * Checked hazardous waste area for leaks finding none * Crushed dumpsters at transfer station * Checked roads for storm damage and made necessary repairs * Cleaned up around garage area * Worked on problems with phone system at garage * Discovered beavers plugging culvert on Hastings Pond Rd. * Met with National Grid on pole placement project on Hastings Pond Rd. * Went to Selectboard meeting Tues. Aug. 12 * Continued fixing storm damage to various roads * Prepared for culvert replacement on Orange Rd. by cemetery * Met with contractor and ordered new entrance doors and window for garages and office * Cut up tree that fell on Orange Rd. Wed. Aug. 13 * Replaced culvert # 8 on Orange Rd. by cemetery and prepared for another culvert replacement for tomorrow Thurs. Aug. 14 * Replaced culvert # 11 on Orange Rd. Fri. Aug. 15 * Jim on vacation day * Trucked two loads of asphalt base from Lane’s * Went to Gardner to get concrete block and then Hamshaw's for concrete on the way back * Fixed up culvert patches on Orange Rd. * Installed bump signs on Orange Rd. by trenches * Checked beaver problem on Hastings Pond Rd. * Repaired culvert # 15 on Shepardson Rd. Warwick Highway Weekly Log Aug. 18 - 24, 2008 Mon. Aug. 18 * Tim on vacation all week * Crushed dumpsters at transfer station * Worked on basin by cemetery * Checked roads for possible storm damage * Jim on vacation day Tues. Aug. 19 * Finished basin by cemetery * Jim on vacation day * Picked up road sign on Orange Rd. * Removed dead animal on Orange Rd. Wed. Aug. 20 * Worked on culvert extensions on Orange Rd. Thurs. Aug. 21 * Cut trees on Orange Rd. * Worked on culverts on Orange Rd. Fri. Aug. 22 * Dug out ledge on Beech Hill Rd. and put one load of rip rap and 64 yds. of gravel in road past culvert # 4 and graded portions of road