Warwick Highway Weekly Log July 28 - Aug. 3, 2008 Mon. July 28 * Made hot top repairs on various roads in town * Checked hazardous waste area for leaks finding none * Drilled ledge on Orange Rd. for blasting Tues. July 29 * Crushed dumpsters at transfer station * Worked with hired blaster on ledge removal on Orange Rd. Wed. July 30 * Began digging out rock that blaster detonated on Orange Rd. and backfilling sites * Began flushing culverts on Orange Rd. that needed cleaning with fire truck Thurs. July 31 * Put extension on inlet side of culvert # 27 on Orange Rd. and built headwall * Continued digging out rock detonated on Orange Rd. * Picked up some used guardrail pieces from Orange Rd. bridge project that were given to the Highway Dept. Fri. Aug. 1 * Jim on vacation day * Continued digging out rock detonated on Orange Rd.