Warwick Highway Weekly Log Sept. 15 - 21, 2008 Mon. Sept. 15 * Checked hazardous waste area for leaks finding none * Crushed dumpsters at transfer station * Cleaned up tree that fell on Northfield Rd. * Removed old culvert on Orange Rd. in preparation of paving project and checked other trenches * Put extension and headwall around culvert # 3 on Pine St. and cleaned out basins and ditch lines Tues. Sept. 16 * Cut up tree on Athol Rd. * Finished HMA patching Hastings Heights Rd. and began Winchester Rd. * Worked on tearing down old addition behind highway garage Wed. Sept. 17 * Continued HMA patching on Winchester Rd. * Cut pavement behind town hall for David Young * Finished tearing down old addition on back of highway garage Thurs. Sept. 18 * Continued HMA patching on Winchester Rd. * Met with Lane on paving project * Met with Gorman salesman on paving project to begin next week * Met with Easthampton officials on old dump truck we are selling * Worked on drain line on fire cistern in center of town with Fire Chief Fri. Sept. 19 * Continued HMA patching Winchester Rd. * Fixed washouts on Winchester Rd. with rip rap * Finished fixing drain on cistern with Fire Chief * Met with Lane on paving project