Warwick Highway Weekly Log Aug. 31 - Sept. 6, 2009 Mon. Aug. 31 * Cracked sealed portion of Orange Rd. and began Wendell Rd. * Crushed dumpsters at transfer station * Replaced cutting edge and wear blocks on Loader * Replaced metal hydraulic lines on front bucket of Backhoe * Checked all roads for damage due to rain storm and took care of problems Tues. Sept. 1 * Finished crack sealing Wendell Rd. * Took plow frame off truck # 2 plow to get it repaired * Worked on basins in Barber Hill area Wed. Sept. 2 * Crack sealed Richmond Rd., portion of Flower Hill Rd. and Chase Hill Rd. * Rip rapped a couple of washouts on Wendell Rd. * Fixed drainage issue on Orange Rd. by town line Thurs. Sept. 3 * Crack sealed Hastings Pond Rd., Rockwood Rd. and portion of Winchester Rd. * Unplugged culvert on Athol Rd. - beaver trapper to begin trapping problem beavers * Picked up truck # 2 in W. Springfield Fri. Sept. 4 * Finished crack sealing Winchester Rd. * Worked around garage cleaning up * Tuned up chainsaws * Cleaned up beaver debris on Athol Rd. culvert